Two new projects in the works
Two fun projects that I'm waiting on some parts for. Hopefully I can start going full steam ahead this weekend.
The first another Guitar for the Guitar town charity auction. It will be similar to last year with a led VU meter embeded into the guitar but I plan on having an amp included inthe guitar so you can just connect your speakers and ipod and there you go.
The second is a timelapse dolly system. I've been doing quite a bit of research and I believe I have purchased all the parts for a basic system. I hope I can start with the timelapse portion this weekend and add the motor controlled dolly next week. I have some big plans for caputring Summit County once this is built.
Photos of both coming soon.
The first another Guitar for the Guitar town charity auction. It will be similar to last year with a led VU meter embeded into the guitar but I plan on having an amp included inthe guitar so you can just connect your speakers and ipod and there you go.
The second is a timelapse dolly system. I've been doing quite a bit of research and I believe I have purchased all the parts for a basic system. I hope I can start with the timelapse portion this weekend and add the motor controlled dolly next week. I have some big plans for caputring Summit County once this is built.
Photos of both coming soon.
Tuesday, July 27, 2010
Ponoko test
So I've started trying to figure out ways to take some of my manual labor out of the process of building these signs. Most of the difficulty comes from building the actual housings. My first attempt to speed this up uses a website called ponoko.com to create the black plastic that blocks the view of the pcbs. You can see my design for the 1 LED sign to the right. The blue lines are cut lines and the grey is for engraving. Hopefully this will allow a spot for the polarized lense to fit. My design is 20% through the process of being built, I'll let you know when it comes in.
Friday, June 11, 2010
Tuesday, April 20, 2010
Monday, April 19, 2010
Friday, March 26, 2010
Tuesday, March 23, 2010
Sunday, March 14, 2010
Polarizing Issue
Monday, March 8, 2010
Friday, March 5, 2010
Wednesday, March 3, 2010
2 Signs Up One to Go
Monday, March 1, 2010
3rd Sign Complete
Just need to winterize/waterproof and finish the power source. Hopefully we'll get these bad boys mounted Tuesday or Wednesday.
Friday, February 26, 2010
Thursday, February 25, 2010
Saturday, February 6, 2010
All three sections are wired
Monday, January 25, 2010
Intermediate Trails Final
Today I finished the Intermediate trail setup. All of the matrixes are mounted in their housings and everything is wired in the order they will appear on the sign. I should be able to get all of the other signs built this week and then we'll just have to mount them,solder all of the final connections and bring it outside. I think it's looking good though.
Tuesday, January 19, 2010
Build process begins